Published Date
PRE-BID MEETING CLERIFICATION - Mobile Diesel Generator Set.
Minutes of Pre-Bid Meeting & Annexure-3 A - Painting of Metallic structures, Pipelines and supports at Reactor Building (RB), Reactor Auxiliary Building (RAB), Turbine Building (TB) and Service Auxiliary Building (SAB) Areas at Tarapur Atomic Power Station-3&4.
MINUTES OF PRE-BID MEETING - AMC on MCC, 6.6 KV, 230 KV Switchgear, HT & LT transformers and EMVs at MAPS.
MINUTES OF PRE-BID MEETING - Testing of Generator Transformer - 2 Unit transformer - 2 & startup transformer -2 during unit - 2 BSD.
CORRIGENDUM - AMC FOR PIPING AND STRUCTURAL WELDING WORKS (2012-2013).
CORRIGENDUM - Overhauling of 6.6 KV HT Motors in Reactor Building, Turbine Building and in Pump House.
CORRIGENDUM-I - Supply of Material and Repair and Modification of ‘TELK’ make Generator Transformer.
MOM of Pre Bid Meeting - Hiring of 01 No.Brand New (Jan-2012 Model or later) Double Bedded Force Traveller Ambulance with A.C. & Power Steering for 24 hours duty per day & 6000 kms run per month for a period of three years.
CORRIGENDUM - Handing, Transportation, Fabrication, erection and Painting of platforms at various lovations in Kaiga 3&4.
CORRIGENDUM - Handling, Grinding, Fit up, Welding, Inspection, erection, Modification/repair of Pipeline, Weld Overlay of Pipes & fitting in Kaiga 3&4.
CORRIGENDUM - Resin Charging in IX Columns & Deuteration & De-Deuteration IX Column Cleaning of Panels and equipment's Flushing of Tanks of Process System, Sampling. Heavy Water Mopping, Distribution and Collection of Data Sheets etc., in Operation Section of KGS 3&4.
CORRIGENDUM - Material Handling Shifting and Sampling of Gas Cylinders, Chemical carbouys, Drums, Loading, Unloading of chlorine tonners, Decanting of HSD, Shifting of equipments, Up Keeping of Data and office records in PC.
CORRIGENDUM - IT Facility management and Annual Maintenance Contract(Comprehensive/Non Comprehensive) for Computers, Servers, Printers, Accessories & LAN Components for the period of 2 Years.
CORRIGENDUM - Re-conditioning of Control Valve Spares.
CORRIGENDUM - Dewatering in Tunnels, Trenches, Basement Floors of Main Plant Bildings and Other Outdoor Areas in Kaiga Generating Station 3&4, at Plant Site, Kaiga during the Year-2012.
CORRIGENDUM - Up-Gradation Toilet Blocks In Kaiga Generating Station 3&4 at Kaiga Plant Site, Kaiga.
MINUTES OF PRE BID MEETING - Hiring of One(1) No. of Brand New Tempo Traveller - Mini Bus 3350mm WB Fitted with TD 2650 FTI Diesel Engine A/C, PS(NF) (CRDI)- BS - IV of 2012 model and above (show room vehicle) on 12 hours basis to run an average 2500 Kms per month for a period of 3 years from 01.06.2012 to 31.05.2015 on contract basis to MAPS.The vehicle will be normally used as Non-A/C vehicle.However, whenever required vehicle will be used as A/C vehicle and A/C charges per Km will be paid.
AMENDMENT - Construction of 2 Nos. of 1750 Cu.Meter capacity Fresh water underground storage tanks at MAPS,Kalpakkam.
AMENDMENT - Providing drafting services for Drawing office & archives and General Maintenance & Up-Keeping of Engineering documents in Centralized Engineering Cell at RR Site.
MINUTES OF PRE BID MEETING - Construction of 2 Nos. of 1750 Cu.Meter capacity Fresh water underground storage tanks at MAPS,Kalpakkam.
MINUTES OF PRE BID MEETING - Annual Painting of various plant Buildings and systems at MAPS, Kalpakkam for the year 2012-13.
CORRIGENDUM-1 - Operation and maintenance of Construction domestic water treatment plant and distribution piping system for KAPP 3&4.
AMENDMENT - Hiring of One (01) No. of Brand New Tempo Traveller - Mini Bus 3350mm WB Fitted with TD 2650 FTI Diesel Engine A/C, PS (NF) (CRDI)– BS – IV of 2012 model and above (Show room vehicle) on 12 hours basis to run an average of 2500 Kms per month for a period of 3 years from 01.06.2012 to 31.05.2015 on contract basis to MAPS. The vehicle will be normally used as Non-A/C vehicle. However, whenever required vehicle will be used as A/C vehicle and A/C charges per Km will be paid.
AMENDMENT - AMC on MCC, 6.6 KV, 230 KV Switchgear, HT & LT transformers and EMVs at MAPS.
CORRIGENDUM-2 - Assistance during maintenance of different jobs in MMU through maintenance contract.
CORRIGENDUM - Assistance during maintenance of different jobs in MMU through maintenance contract.
Due Date Extension for Nuclear intrumentation Package for KAPP 3&4 and RAPP 7&8
AMENDMENT - Providing supports to the new 150NB effluent discharge line supports at MAPS, Kalpakkam.
Extenstion of Sale Period - REPLACING THE OLD DAMAGED FALSE CEILING WITH ALUMINIUM COMPOSITE PANEL FALSE CEILING AT NPCIL GUEST HOUSE ,MAPS, KALPAKKAM.
Minutes of the Pre-bid Meeting - Rehabilitation of Intake structure at MAPS, Kalpakkam.
Minutes of the Pre-bid Meeting - Conversion of 7 blocks "B" type multi storied quarters in to 79 Nos. "C" type quarters and 9 blocks of multi storied "A" type quarters into 45 nos. "D" type quarters at KAPS T/S, Dist.Tapi, Gujarat-394651.
AMENDMENT - Rehabilitation of Intake structure at MAPS, Kalpakkam.
Minutes of the Pre-bid Meeting - Providing and laying water proofing treatment (EPDM) over the roofs of Turbine building #4, DM Plant, FC Plant, SRPH, Switch yard, Laundry, CWPH, & VTF building roof at RAPS-3&4, Plant Site.
Technical Clarification Response - 1, Commercial Clarification Response-1 & Due Date Extension for Nuclear intrumentation Package for KAPP 3&4 and RAPP 7&8
ADDENDUM - Rewinding of 6.6KV, 410KW 3 phase PSW and CCW Motors Qty - 14 Numbers.
Pre-Bid Meeting - Design, Construction, Manufacture, Supply, Erection, Commissioning & Testing of four numbers Induced Draught Cooling Towers and allied works for Rajasthan Atomic Power Project- Units 7&8.
CORRIGENDUM-2 - Handling, Installation, Alignment, Welding & Inspedction of Nuclear Core Components of KAPP-3&4.
Pre-Bid Meeting - Shifting of contaminated trays from KARP/UGP, MAPS and assistance for decontamination of critical components/tools.
AMENDMENT - AMC for fire water and DM Plant system maintenance works.
NIT AMENDMENT-II - Running of Industrial Canteen at Plant Site on round the clock shift basis on all days for the employees & contractor workers at NAPS Plant Site Narora.
Pre-Bid Meeting - Supply of installation of Safety Steel Door for residential quarters in Anusri & Anuvikas townships at TMS.
Pre-Bid Meeting - Handling, Installation, Alignment, Welding & Inspedction of Nuclear Core Components of KAPP-3&4.
NIT AMENDMENT-I - Running of Industrial Canteen at Plant Site on round the clock shift basis on all days for the employees & contractor workers at NAPS Plant Site Narora.
CORRIGENDUM - Handling, Installation, Alignment, Welding & Inspedction of Nuclear Core Components of KAPP-3&4.
Minutes of Pre-bid Meeting - Running of catering services, Room services, front and House Keeping maintenance in NPCIL Guest House NTC Hostel and Transit Accommodation at DAE Township, Kalpakkam.
ADDENDUM - AMC for Cleaning/replacement of Cooling coils&Filters in Ventilation System.
Response to Pre-bid Querries - Supply of Moderator Canned Motor Pumps for KGS-1&2 and RAPs--3&4.
Addendum & Minutes of Pre-bid Meeting - AMC for Unit-1 Ventilation System Fans.
Addendum - AMC for Unit-2 Ventilation System Fans.
Minutes of Pre-bid Meeting - AMC for Unit-2 Ventilation System Fans.
Amendment - Installation of Water Purifiers along with associated accessories including piping, water tank and water fountain to nine village schools nearby Kalpakkam.
Minutes of Pre-bid Meeting - Installation of Water Purifiers along with associated accessories including piping, water tank and water fountain to nine village schools nearby Kalpakkam.
Due Date Extension - Mobile Diesel Generator Set.
CORRIGENDUM - Mobile Diesel Generator Set.(ADDITIONAL QUERY)
ADDENDUM NO. 09 - EPC Package of Natural Draught Cooling Towers, Condenser Cooling Water Pump House and Allied Works for KAPP – 3&4.
CORRIGENDUM - Supply of Material and Repair of ‘TELK' make Generator Transformer.
CORRIGENDUM - Mobile Diesel Generator Set.
CORRIGENDUM - Supply of installation of Safety Steel Door for residential quarters in Anusri & Anuvikas townships at TMS.
Extension of Sale Date - Running of Catering services, Room services, Front Office and House keeping Maintenance in NPCIL Guest House NTC hostel and Transit Accommodation at DAE Township, Kalpakkam.
Extension of Sale Date - Annual Painting of various plant Buildings and systems at MAPS, Kalpakkam for the year 2012-13.
ADDENDUM-8 - EPC Package of Natural Draught Cooling Towers, Condenser Cooling Water Pump House and Allied Works for KAPP – 3&4.
ADDENDUM-7 - EPC Package of Natural Draught Cooling Towers, Condenser Cooling Water Pump House and Allied Works for KAPP – 3&4.
ADDENDUM-II - Maintenance of Station Lighting.
ADDENDUM-6 - EPC Package of Natural Draught Cooling Towers, Condenser Cooling Water Pump House and Allied Works for KAPP – 3&4.
PRE BID MEETING - Execution of Interior and Audiovisual works for Common Building at KAPP-3&4, Plant site.
ADDENDUM-5 - EPC Package of Natural Draught Cooling Towers, Condenser Cooling Water Pump House and Allied Works for KAPP – 3&4.
ADDENDUM-4 - EPC Package of Natural Draught Cooling Towers, Condenser Cooling Water Pump House and Allied Works for KAPP – 3&4.
ADDENDUM-3 - EPC Package of Natural Draught Cooling Towers, Condenser Cooling Water Pump House and Allied Works for KAPP – 3&4.
CORRIGENDUM - Manufacturing, inspection and supply of 0.1 micron absolute rated positive zeta potential resin bonded glass fibre filter assy.
PRE-BID CLARIFICATION-SET-2 - for Design, Engineering, Supply, Erection & Commissioning, Trial Operation and Operation & Maintenance of ClO2 & DM Plant for Plant Water System Package for 700MWe Nuclear Power Plant at RAPP-7&8.
ADDENDUM-2 - EPC Package of Natural Draught Cooling Towers, Condenser Cooling Water Pump House and Allied Works for KAPP – 3&4.
CORRIGENDUM - for Water proofing works under maintenance jobs for Main Plant Buildings, Tunnels and Ducts openings at Kaiga Generating Station Unit-1&2, Kaiga.
PRE-Bid Clarifications - for Design, Engineering, Supply, Erection & Commissioning, Trial Operation and Operation & Maintenance of ClO2 & DM Plant for Plant Water System Package for 700MWe Nuclear Power Plant at RAPP-7&8.
PRE-Bid Clarifications - for ELECTRO MAGENETIC TRANSIENT (EMT) ANALYSIS SOFTWARE WITH TECHNICAL SUPPORT AND UPGRADES FOR 2 YEARS.
NIT Corrigendum - I - Operation and maintenance of communication systems i.e. Telephone/ PA System/ Display System/ VC/ Wireless etc at NAPS.
CORRIGENDUM - Assistance in Fuel Handling Section (FHS), Operation & Control Maintenance jobs during Unit operating conditions, Biennial Shut down and Planned shutdown at FHS, RAPS-3&4 for one year.
ADDENDUM - EPC Package of Natural Draught Cooling Towers, Condenser Cooling Water Pump House and Allied Works for KAPP – 3&4.
CORRIGENDUM - Supply, Operation & Maintenance of 04 (Four) Nos. Tata Indica Vista (Non-AC) Car and 01 (One) Tata Indica Vista, AC Car, showroom condition, required for Three years duration on contract basis to RR Site.
CORRIGENDUM - Supply of Water Lubricated Bearings.
CORRIGENDUM - Hiring of 02 nos. Brand New TATA Sumo Spacio Jeeps with Driver.
CORRIGENDUM - Manufacturing, Testing, Delivery, Installation, Commissioning, Imparting Training and Warranty of Electro Magnetic Transient (EMT) Analysis Software with Technical Support and Upgrades for 2 years.
Pre-Bid Meeting OPERATION & MAINTENANCE OF ELECTRICAL POWER SUPPLY DISTRIBUTION NETWORK OF 11 KV / 415 V, ASSOCIATED SWITCH GEAR, STREET LIGHTING, INTERNAL & EXTERNAL POWER SUPPLY IN PUBLIC & RESIDENTIAL BUILDING OF ELECTRICAL INSTALLATION OF ANUKIRAN, ANUPRATAP, ANUTARA & SANTAB COLONIES, KOTA GUEST HOUSE INCLUDING 11 KV HT LINE FROM BAROLI GSS/ DIESEL POWER HOUSE TO NPCIL RAPS COLONIES & OTHERS MISCELLANEOUS WORKS IN RAPS-1 TO 6 COLONIES.
Pre-Bid Meeting OPERATION & MAINTENANCE OF ELECTRICAL POWER SUPPLY DISTRIBUTION NETWORK OF 11 KV/ 415 V, ASSOCIATED SWITCH GEAR, STREET LIGHTING, INTERNAL & EXTERNAL POWER SUPPLY IN PUBLIC & RESIDENTIAL BUILDINGS OF ELECTRICAL INSTALLATIONS OF...
Pre-Bid Meeting Maintenance of lighting installation & associated works at RAPS-3&4 for Two Year i.e. 2011-2012 & 2012-2013.
With reference to Tender Notice No. - 07/2011-01
Clarification of Queries.
Pre-Bid Queries Clarifications & due date extension for Project/Plant Lifecycle Management and its Integration with various other process at NPCIL HQ, KAPP-3&4 and RAPP-7&8.
CORRIGENDUM - Annual Maintenance Repairs upkeeping of building interior areas gardens / lawns of AECS No. 2 at Anuchhaya and AECS No. 4 Anukiran Colony during the year 2011-2012.
CORRIGENDUM - Annual Civil Maintenance, Repairs of Residential and Public buildings & Other miscellaneous works in Anu Kiran for the year 2011-2012.
Technical and Commercial Clarification for Project/Plant Lifecycle Management and its Integration with various other process at NPCIL HQ, KAPP-3&4 and RAPP-7&8.
Pre-Bid Meeting Engineering Drafting Work to be Carried Out at NPCIL, Anushaktinagar, Mumbai-400094.
Due Date Extension for Project/Plant Lifecycle Management
CORRIGENDUM - Extension for Submission of Tender Document Comprehensive internal furnishing involving Furniture, Air-conditioning, Fire alarm system and other miscellaneous works for Jaitapur Nuclear Power Project, Liaison office cum Transit Guest house at Ratnagiri, Maharashtra State.
CORRIGENDUM - Pre-Bid Clarifications Supply, installation, operation & maintenance of construction power supply network and temporary lighting system in main plant buildings KAPP-3&4.
Due Date Extension for Control Centre Instrumentation Package for KAPP 3&4 and RAPP 7&8
Control Centre Instrumentation Package for KAPP 3&4 and RAPP 7&8
CORRIGENDUM - Date of Pre-bid meeting Construction of various types of quarters, public buildings and other infrastructure facilities in Anuvijay Township at Chettikulam Village – Phase C activity of KKNPP 3 to 6.
Pre-Bid Additional Technical Clarifications Main Plant Air Conditioning and Ventilation Package for KAPP-3&4 and RAPP-7&8 Projects.
Technical Clarification (Response-4), Technical Documents and Due Date Extension for Control Centre Instrumentation Package for KAPP 3&4 and RAPP 7&8
Technical Clarification (Response-3) Technical Documents for Control Centre Instrumentation Package for KAPP 3&4 and RAPP 7&8
NIT AMENDMENT - II Front office Management, Room Service, Catering & House Keeping of Guest House, Trainees Hostel & Multipurpose Hall of Narora Atomic Power Station situated at Anu vihar Township, Distt. Bulandshahr (U.P.) -202389 for the period of two years.
NIT AMENDMENT - II Contract for catering, room service, front office, housekeeping management etc. in Nuclear Power Corporation of India Limited (NPCIL), Noida office cum Transit Accommodation situated at Sector-62, plot No. C-56/48, Institutional Area, Noida Distt: Gautam Budh Nagar (U.P.) for the period of 2 years.
CORRIGENDUM Operation & Maintenance of electrical power supply distribution network of 11KV / 415V, associated Switch gear, street lighting, internal & external power supply in public & residential buildings of electrical installations of :- a) Anuchhaya, Anudeep, Vikram Nagar & Anuasha Colonies. b) Electrical Metering & Billing system of and RAPS colonies including 11 KV HT line from Diesel Power House to NPCIL RAPS colonies & others Miscellaneous works in RAPS-1 to6 colonies.
CORRIGENDUM Operation & Maintenance of electrical power supply distribution network of 11KV / 415V, associated Switch gear, street lighting, internal & external power supply in public & residential buildings of electrical installations of Anukiran, Anupratap, Anutara & Sentab Colonies, Kota Guest House, including 11 KV HT line from Baroli GSS/Diesel Power House to NPCIL RAPS colonies & others Miscellaneous works in RAPS - 1 to 6 colonies.
Technical Clarification Response-2 Control Centre Instrumentation Package for KAPP 3&4 and RAPP 7&8
Commercial Clarification Response-1 and Technical Clarification Response-1 alongwith extension of due date for submission of bid (Part-I and Part-II) and opening of bid (Part-I).
CORRIGENDUM Supply, installation, operation & maintenance of construction power supply network and temporary lighting system in main plant buildings KAPP-3&4.
CORRIGENDUM Annual Maintenance Contract for PCs, Servers, Facility Management of LAN, Management of Web Site & Application Software Support.
CORRIGENDUM Providing and Applying External Surface Painting of Main Plant Buildings in Kaiga Generating Station 3&4 at Kaiga Plant Site, Kaiga.
Pre-Bid Technical Clarifications Main Plant Air Conditioning and Ventilation Package for KAPP-3&4 and RAPP-7&8 Projects.
Pre-Bid Meeting Supply, Transportation, Handling, Fabrication, Installation, Welding, NDTs examinations of CS liner work & radiation resistant epoxy painting of F/M vaults & F/M service area and structural work of KAPP-3&4.
MOM of pre-bid meeting held on 25.07.2011 Construction of 60 nos. Executive Apartments in (Stilt+3) configuration at Anuvikas(TAPS-3&4) Township, Tarapur Maharashtra Site.
AMENDMENT-I - Upkeep of First Aid Center, OPD, Blood Bank, Casualty, Kitchen services to patients and preparation of Hospital Data.
NOTICE FOR REVISED DATE OF SUBMISSION OF TENDER
Technical Clarification (Response-2) and Commercial Clarification (Response-2) and Extension of due date for submission of Bid for Field Instrumentation Package
Construction of 60 nos. Executive Apartments in (Stilt+3) configuration at Anuvikas(TAPS-3&4) Township, Tarapur Maharashtra Site.
Opening, cleaning and box up of condenser hot well, manhole covers, opening of HP extraction lines and material shifting, operation of crane for lifting of various equipments etc in BSD U#1.
Commercial Clarification Response-1 and Technical Clarification Response-1 along with Revised Section-E - Revision-1.
Due Date Extension
Hiring of 06nos. Tata Sumo Spacio Jeeps with driver, 01no. Tata Sumo Spacio Jeep without driver and 02 nos Hero Honda Motor cycles for the period of three years.
Maintenance of Lawn and ground covers in Sector II in phase I& phase II area at Kaiga Township; Mallapur, for the year 2011-1012.
With reference to Tender Notice No. - 10 / 2010-01
3.0) EXTENSION OF DUE DATE AND REVISION OF PART-II (PRICE ) FORMAT (SECTION-E Revision-1) FOR HEAVY WATER UPGRADING PLANT (UGP) AND WASTE MANAGEMENT PLANT (WMP) PACKAGE FOR KAPP-3&4 AND RAPP-7&8 PROJECTS.
2.0) Technical Clarifications to pre-bid queries from *04.05.2011 to 13.05.2011.*
1.0) Pre-bid clarifications against Tender No.CMM/FTP/23-34-1-1091 for Heavy Water Upgrading Plant (UGP) and Waste Management Plant (WMP) Package for KAPP-3&4 and RAPP-7&8.
Tender Cancellation
Minutes of Pre-Bid Meeting held on 28.04.2011 .
Minutes Of Pre-Bid Meeting.
Pre-Bid Meeting held on 18.04.2011 .
Technical Clarifications for Field Instrumentation Package for KAPP-3&4 and RAPP-7&8.
Minutes of Pre-bid meeting with tenderers held on 17.03.2010
Minutes of Pre-bid meeting held on 15.03.2010
Pre-Bid meeting dated 08-Mar-2011
Field Instrumentation Package for KAPP-3&4 and RAPP-7&8.
Last date of submission of bid (Part-I and Part-II) and opening of bid (Part-I) has been rescheduled
Technical queries Response-4, Commercial queries Response-3 and Covering letter of Price Bid Format
Technical queries (Response-3)
Commercial queries Response-2 and Technical queries Response-2 along with Revised Section-E-Revision-1.
Minutes of Pre-bid meeting held on 10.01.2010
Commercial queries Response-1 and Technical queries Response-1.
Common Services Package for KAPP-3&4 and RAPP-7&8.
Pre-bid Technical clarifications – II (Response-2) for Electrical Systems Package for KAPP-3&4 and RAPP-7&8.
With reference to Tender Notice No. - 07 / 2010-01
Last date of submission of bid and opening of bid has been rescheduled and Response to Technical queries (Response-7)
Response to Technical queries (Response-6)
Corrigendum - Prebid Technical Queries & Revised Price Schedule for Tender No. CMM / MEQ / 23-50-2-1038 for Electrical Systems Package for KAPP-3&4 and RAPP-7&8.
Last date of submission of bid and opening of bid has been rescheduled
Response to Technical queries (Response-5) along with Revised Section-E-R-2
Response to Technical queries (Response-4) along with Revised Section-E-R1
With reference to Tender Notice No. - 08 / 2010 - 03
Pre-bid meeting held on 12.10.2010
Technical and Commercial Clarifications for Primary Piping Package for KAPP-3&4 and RAPP-7&8
CMM / HMP / 23-30-10-013
21/09/2010
Clarifications for queries raised before 24.08.2010 (except commercial) along with extension of Due Date for submission of both Part-I and Part-II offer.